BRC Historical Photos

2005 - BRC evaporation pond prior to remediation.
2005 - BRC evaporation pond prior to remediation.
2007 - Layering of disposal pond and underlying soil exposed during excavation activities to remediate a typical evaporation pond.
2007 - Layering of disposal pond and underlying soil exposed during excavation activities to remediate a typical evaporation pond.
2015 - BRC CAMU (engineered and permitted landfill) containing remediation material from former BMI evaporation ponds.  View is from the Warm Springs Road entrance.
2015 - BRC CAMU (engineered and permitted landfill) containing remediation material from former BMI evaporation ponds.  View is from the Warm Springs Road entrance.
2016 - Typical CAMU details; sloped cover material, stormwater control, concrete run-off channel, and leachate sump/monitoring equipment.
2016 - Typical CAMU details; sloped cover material, stormwater control, concrete run-off channel, and leachate sump/monitoring equipment.
2016 - Example of abandoned effluent disposal line (was routed to former evaporation ponds) being removed from BRC property.
2016 - Example of abandoned effluent disposal line (was routed to former evaporation ponds) being removed from BRC property.