Funding Requests
The following are the Appendix D-4 Beneficiary Eligible Mitigation Action Certifications that have been submitted by the Division of Environmental Protection on Behalf of the State of Nevada and approved by Wilmington Trust. The funding requests have been sorted by the category of Eligible Mitigation Action and when they were approved by Wilmington Trust. Be aware that all confidential banking information (Appendix D-4 Beneficiary Eligible Mitigation Action Certification Attachment A) has been removed from these publicly accessible Eligible Mitigation Action Certifications.
Category 1 – Class 8 Eligible Large Trucks
Category 2 – Class 4-8 Eligible Buses
Category 6 - Class 4-7 Local Frieght Trucks (Medium Trucks)
Category 7 – Airport Ground Support Equipment
Category 9 – Light Duty Zero Emission Vehicle Supply Equipment
Category 10 – The Diesel Emission Reduction Act (DERA) Option
Category 1 – Class 8 Eligible Large Trucks
Completed Category 1 Projects
Action Title: DEMF – Republic Services Refuse Truck Replacement
Project ID: NVDEMF 19-03
Date Approved: March 31, 2019
NOx Mitigation: 6.24 tons
Project Summary: NDEP has awarded Republic Services $200,000.00 to support the early retirement and replacement of five diesel-powered refuse trucks with five compressed natural gas (CNG) powered refuse trucks.
Download Eligible Mitigation Action NVDEMF 19-03
Action Title: DEMF – Waste Management Refuse Truck Replacement
Project ID: NVDEMF 20-10
Date Approved: June 1, 2020
NOx Mitigation: 12.241 tons
Project Summary: NDEP has awarded Waste Management $225,000 to support the early retirement and replacement of five diesel-powered refuse trucks owned and operated by Waste Management in Washoe County, Nevada for five new CNG-powered refuse trucks.
Download Eligible Mitigation Action NVDEMF 20-10
Action Title: DEMF – Republic Services Refuse Truck Replacement 2
Project ID: NVDEMF 21-04
Date Approved: December 14, 2021
NOx Mitigation: 14.64 tons
Project Summary: NDEP has awarded Republic Services $760,000.00 to support the early retirement and replacement of 19 diesel-powered refuse trucks with 19 compressed natural gas (CNG) powered refuse trucks.
Download Eligible Mitigation Action NVDEMF 21-04
Cancelled Category 1 Projects
Action Title: DEMF – MGM Grand Semitruck Replacement
Project ID: NVDEMF 22-02
Date Approved: September 14, 2022
Date Canceled: April 14, 2023
NOx Mitigation: 0.564 tons
Project Summary: NDEP has awarded MGM Grand $265,000.00 to support the early retirement and replacement of one diesel-powered semitruck owned by MGM Grand and operated by Grand Laundry in Clark County, Nevada for one new battery-electric semitruck. Due to increased project costs, it was mutually agreed between all parties to cancel the subgrant. The funds are now available for future projects.
Download Eligible Mitigation Action NVDEMF 22-02
Category 2 – Class 4-8 Eligible Buses
Completed Category 2 Projects
Action Title: DEMF – Washoe County School District School Bus Replacement
Project ID: NVDEMF 18-07
Date Approved: February 15, 2019
NOx Mitigation: 1.37 tons
Project Summary: NDEP has awarded Washoe County School District $383,725.00 to support the early retirement and replacement of five-1997 engine model year diesel-powered school buses with five-2019 engine model year school buses.
Download Eligible Mitigation Action NVDEMF 18-07
Action Title: DEMF – Humboldt County School District School Bus Replacement
Project ID: NVDEMF 18-08
Date Approved: February 15, 2019
NOx Mitigation: 0.81 tons
Project Summary: NDEP has awarded Humboldt County School District $65,601.13 to support the early retirement and replacement of one-1993 engine model year diesel-powered school bus with one-2019 engine model year school bus.
Download Eligible Mitigation Action NVDEMF 18-08
Action Title: DEMF – Pershing County School District School Bus Replacement
Project ID: NVDEMF 18-09
Date Approved: February 15, 2019
NOx Mitigation: 2.28 tons
Project Summary: NDEP has awarded Pershing County School District $73,375.00 to support the early retirement and replacement of one-1995 engine model year diesel-powered school buses with one-2019 engine model year school bus.
Download Eligible Mitigation Action NVDEMF 18-09
Action Title: DEMF – Clark County School District School Bus Replacement
Project ID: NVDEMF 19-04
Date Approved: March 31, 2019
NOx Mitigation: 2.04 tons
Project Summary: NDEP has awarded Clark County School District $150,000.00 to support the early retirement and replacement of five-2005 engine model year diesel-powered school buses with five-2019 engine model year school buses.
Download Eligible Mitigation Action NVDEMF 19-04
Action Title: DEMF – Southern Nevada RTC Transit Bus Replacement
Project ID: NVDEMF 19-08
Date Approved: May 13, 2019
NOx Mitigation: 10.47 tons
Project Summary: NDEP has awarded the Southern Nevada Regional Transportation Commission $300,000.00 to support the early retirement and replacement of five diesel-powered transit buses with five compressed natural gas (CNG) powered transit buses.
Download Eligible Mitigation Action NVDEMF 19-08
Action Title: DEMF – Humboldt County School District School Bus Replacement 2
Project ID: NVDEMF 20-09
Date Approved: June 1, 2020
NOx Mitigation: 2.88 tons
Project Summary: NDEP has awarded Humboldt County School District $555,072.19 to support the early retirement and replacement of five-1997 engine model year diesel-powered school bus with five-2020 engine model year school buses.
Download Eligible Mitigation Action NVDEMF 20-09
Ongoing Category 2 Projects
Action Title: DEMF – Clark County Department of Aviation Shuttle Bus Replacements
Project ID: NVDEMF 22-01
Date Approved: September 14, 2022
NOx Mitigation: 103.83 tons
Project Summary: NDEP has awarded the Clark County Department of Aviation $4,950,000.00 to support the early retirement and replacement of eleven-2006 engine model year- diesel-powered shuttle buses for battery-electric shuttle buses.
Download Eligible Mitigation Action NVDEMF 22-01
Download Revised Eligible Mitigation Action NVDEMF 22-01
Category 6 – Class 4-7 Local Freight Trucks (Medium Trucks)
Completed Category 6 Projects
Action Title: DEMF – Carson Tahoe Health Box Truck Replacement
Project ID: NVDEMF 22-03
Date Approved: September 14, 2022
NOx Mitigation: 0.717 tons
Project Summary: NDEP has awarded Carson Tahoe Regional Healthcare $241,008.76 to support the early retirement and replacement of one-1999 diesel-powered box truck operated through numerous counties in Northern Nevada for one new battery-electric box truck.
Download Eligible Mitigation Action NVDEMF 22-03
Category 7 – Airport Ground Support Equipment
Completed Category 7 Projects
Action Title: DEMF – Southwest Airlines LAS AGSE Replacement
Project ID: NVDEMF 18-10
Date Approved: February 25, 2019
NOx Mitigation: 601.63 tons
Project Summary: NDEP has awarded Southwest Airlines $3,655,661.29 to support the early retirement and replacement of 109 pieces of airport ground support equipment located at the McCarran International Airport in Las Vegas, Nevada.
Download Eligible Mitigation Action NVDEMF 18-10
Action Title: DEMF – Southwest Airlines RNO AGSE Replacement
Project ID: NVDEMF 18-11
Date Approved: February 25, 2019
NOx Mitigation: 49.94 tons
Project Summary: NDEP has awarded Southwest Airlines $674,021.23 to support the early retirement and replacement of 20 pieces of airport ground support equipment located at the Reno-Tahoe International Airport in Reno, Nevada.
Download Eligible Mitigation Action NVDEMF 18-11
Action Title: DEMF – Allegiant Air LAS AGSE Replacement
Project ID: NVDEMF 19-02
Date Approved: March 31, 2019
NOx Mitigation: 1.57 tons
Project Summary: NDEP has awarded Allegiant Air $86,432.99 to support the early retirement and replacement of one piece of airport ground support equipment located at the McCarran International Airport in Las Vegas, Nevada.
Download Eligible Mitigation Action NVDEMF 19-02
Action Title: DEMF – United Airlines LAS AGSE Replacement
Project ID: NVDEMF 19-06
Date Approved: May 13, 2019
NOx Mitigation: 45.71 tons
Project Summary: NDEP has awarded United Airlines $658,043.40 to support the early retirement and replacement of 21 pieces of airport ground support equipment located at the McCarran International Airport in Las Vegas, Nevada.
Download Eligible Mitigation Action NVDEMF 19-06
Action Title: DEMF – United Airlines RNO AGSE Replacement
Project ID: NVDEMF 19-07
Date Approved: May 13, 2019
NOx Mitigation: 19.97 tons
Project Summary: NDEP has awarded United Airlines $226,954.20 to support the early retirement and replacement of 11 pieces of airport ground support equipment located at the Reno-Tahoe International Airport in Reno, Nevada.
Download Eligible Mitigation Action NVDEMF 19-07
Action Title: DEMF – Southwest Airlines LAS Pushback Replacement
Project ID: NVDEMF 20-14
Date Approved: September 22, 2020
NOx Mitigation: 14.41 tons
Project Summary: NDEP has awarded Southwest Airlines $1,072,702.22 to support the early retirement and replacement of eight pieces of airport ground support equipment located at the McCarran International Airport in Las Vegas, Nevada.
Download Eligible Mitigation Action NVDEMF 20-14
Download Revised Eligible Mitigation Action NVDEMF 20-14
Cancelled Category 7 Projects
Action Title: DEMF – Allegiant Air LAS AGSE Replacement
Project ID: NVDEMF 20-13
Date Approved: August 21, 2020
Date Cancelled: December 31, 2022
NOx Mitigation: 3.81 tons
Project Summary: NDEP had awarded Allegiant Air $127,308.00 to support the early retirement and replacement of four pieces of airport ground support equipment located at the McCarran International Airport in Las Vegas, Nevada. Due to labor shortages, supply chain issues, and increased project costs, it was mutually agreed between all parties to allow the subgrant to expire. The funds are now available for future projects.
Download Eligible Mitigation Action NVDEMF 20-13
Category 9 – Light Duty Zero Emission Vehicle Supply Equipment
All Category 9 Funding Requests supported the development of the Nevada Electric Highway. For more information on the Nevada Electric Highway, visit the Nevada Governor's Office of Energy's (GOE) website at http://energy.nv.gov/Programs/Nevada_Electric_Highway/ or call (775) 687-1850.
Completed Category 9 Projects
Action Title: Nevada Electric Highway, Moapa Charging Station
Project ID: NVDEMF 18-05
Date Approved: November 30, 2018
NOx Mitigation: 0.04 tons
Project Summary: This project will install publicly available light duty electric vehicle charging infrastructure at a non-government owned property in Glendale, NV. Specifically, the charging station will be installed at the AM/PM located at 2300 E. Glendale Blvd, Glendale, Nevada, 89025. One Direct Current Fast Charger (the charger will have 2 cords, one SAE Combo and one CHAdeMO, but only one can be in use at a time) and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 18-05
Action Title: NEH, Phase 2, Amargosa Valley (Lathrop Wells)
Project ID: NVDEMF 18-06
Date Approved: December 10, 2018
NOx Mitigation: 0.1 tons
Project Summary: This project will install publicly available light duty electric vehicle charging infrastructure at a government owned property in Amargosa Valley. Specifically, the charging station will be installed at the intersection of Hwy 373 and Hwy 95 in Lathrop Wells, NV approximately 30 miles from Beatty, NV. One Direct Current Fast Charger (the charger will have 2 cords, one SAE Combo and one CHAdeMO, but only one can be in use at a time) and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 18-06
Action Title: NEH, Phase 2, Ely Charging Station
Project ID: NVDEMF 19-01
Date Approved: March 26, 2019
NOx Mitigation: 0.04 tons
Project Summary: NDEP has awarded $141,295.08 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Ely, Nevada. Specifically, the charging infrastructure will be installed near the junction of Highways 6, 50, and 93 and will have various gas stations and food restaurants nearby. One Direct Current Fast Charger (the charger will have 2 cords, one SAE Combo and one CHAdeMO, but only one can be in use at a time) and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 19-01
Download the revised Eligible Mitigation Action submission for NVDEMF 19-01
Action Title: NEH – Mesquite Charging Station
Project ID: NVDEMF 19-05
Date Approved: April 23, 2019
NOx Mitigation: 0.04 tons
Project Summary: NDEP has awarded $120,000.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Mesquite, Nevada. Specifically, the charging infrastructure will be installed off of Interstate 15 Exit 118 at the Eagle’s Landing Travel Plaza. One Direct Current Fast Charger (the charger will have two cords, one SAE Combo and one CHAdeMO, but only one can be in use at a time) and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 19-05
Action Title: NEH, Phase 2, Jean Charging Station
Project ID: NVDEMF 19-09
Date Approved: May 13, 2019
NOx Mitigation: 0.05 tons
Project Summary: NDEP has awarded $37,500 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Jean, Nevada. Specifically, the charging infrastructure will be installed off of Interstate 15 Exit 12 at 1 Goodsprings Rd, the Terrible Herbst Convenience Store/Chevron gas station. One Direct Current Fast Charger (the charger will have two cords, one SAE Combo and one CHAdeMO, but only one can be in use at a time) and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 19-09
Action Title: NEH - Indian Springs Charging Station
Project ID: NVDEMF 19-11
Date Approved: October 15, 2019
NOx Mitigation: 0.05 tons
Project Summary: NDEP has awarded $120,000.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Indian Springs, Nevada. Specifically, the charging infrastructure will be installed at 230 N Highway 95 in Indian Springs, Nevada. One Direct Current Fast Charger and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 19-11
Action Title: NEH – West Wendover Charging Station
Project ID: NVDEMF 19-12
Date Approved: October 15, 2019
NOx Mitigation: 0.10 tons
Project Summary: This project will install publicly available light duty electric vehicle charging infrastructure at a Government Owned Property in West Wendover, Nevada. Specifically, the charging infrastructure will be installed at the City of West Wendover Welcome Center at 735 West Wendover Blvd. in West Wendover, Nevada. One Direct Current Fast Charger and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 19-12
Action Title: NEH – Alamo Charging Station
Project ID: NVDEMF 19-13
Date Approved: October 15, 2019
NOx Mitigation: 0.10 tons
Project Summary: NDEP has awarded $240,000.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in West Wendover, Nevada. Specifically, the charging infrastructure will be installed at 37 Hwy. 93, Alamo, Nevada near the Lincoln County Physical Therapy office. Two Direct Current Fast Chargers will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 19-13
Action Title: NEH – Jackpot Charging Station
Project ID: NVDEMF 20-02
Date Approved: April 20, 2020
NOx Mitigation: 0.05 tons
Project Summary: NDEP has awarded $119,999.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Jackpot, Nevada. Specifically, the charging infrastructure will be installed at Cactus Petes Casino at 1385 US-93, Jackpot, NV 89825. One Direct Current Fast Charger and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-02
Action Title: NEH – McDermitt Charging Station
Project ID: NVDEMF 20-03
Date Approved: April 20, 2020
NOx Mitigation: 0.05 tons
Project Summary: NDEP has awarded $120,000.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in McDermitt, Nevada. Specifically, the charging infrastructure will be installed at the Quinn River Market at 195 US-95, McDermitt, NV 89421. Two Direct Current Fast Chargers will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-03
Action Title: NEH – Silver Springs Charging Station
Project ID: NVDEMF 20-04
Date Approved: April 20, 2020
NOx Mitigation: 0.08 tons
Project Summary: NDEP has awarded $60,676.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Silver Springs, Nevada. Specifically, the charging infrastructure will be installed at the Silver Springs Nugget Casino at 1280 Lincoln Hwy, Silver Springs, NV 89429. Two Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-04
Action Title: NEH – Fallon Charging Station
Project ID: NVDEMF 20-05
Date Approved: April 20, 2020
NOx Mitigation: 0.09 tons
Project Summary: NDEP has awarded $72,083.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Fallon, Nevada. Specifically, the charging infrastructure will be installed at the Cold Springs Station Resort at 52300 Austin Hwy, Fallon, NV 89406. Two Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-05
Action Title: NEH – Austin Charging Station
Project ID: NVDEMF 20-06
Date Approved: April 20, 2020
NOx Mitigation: 0.09 tons
Project Summary: NDEP has awarded $77,404.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Austin, Nevada. Specifically, the charging infrastructure will be installed at the Chevron Station at 30 Main St. Austin, NV 89310. Two Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-06
Download the revised Eligible Mitigation Action submission for NVDEMF 20-06
Action Title: NEH – Orovada Charging Station
Project ID: NVDEMF 20-07
Date Approved: April 20, 2020
NOx Mitigation: 0.05 tons
Project Summary: NDEP has awarded $120,000.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Orovada, Nevada. Specifically, the charging infrastructure will be installed at the Sawtooth Station at 24810 US-95, Orovada, NV 89425. Two Direct Current Fast Chargers will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-07
Action Title: NEH – Luning Charging Station
Project ID: NVDEMF 20-08
Date Approved: April 20, 2020
NOx Mitigation: 0.09 tons
Project Summary: NDEP has awarded $65,939.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Luning, Nevada. Specifically, the charging infrastructure will be installed at the Luning Trading Post at 300 Plymire RD (HWY 95) Luning, NV 89420. Two Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-08
Action Title: NEH – Goldfield Charging Station
Project ID: NVDEMF 20-11
Date Approved: July 14th, 2020
NOx Mitigation: 0.01 tons
Project Summary: NDEP has awarded $74,278.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Goldfield, Nevada. Specifically, the charging infrastructure will be installed at the Goldfield Visitor’s Center at the corner of 1st Street and US 95. Two Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-11
Action Title: NEH – Schurz Charging Station
Project ID: NVDEMF 20-15
Date Approved: October 26th, 2020
NOx Mitigation: 0.01 tons
Project Summary: NDEP has awarded $70,734.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Schurz, Nevada. Specifically, the charging infrastructure will be installed near the Four Seasons Smoke Shop and Walker River Coffee Roasters at 4060 US 95 Schurz, Nevada 89427. Two Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-15
Action Title: NEH – Rye Patch Charging Station
Project ID: NVDEMF 20-16
Date Approved: April 5, 2021
NOx Mitigation: 0.213 tons
Project Summary: NDEP has awarded $263,948.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Lovelock, Nevada. Specifically, the charging infrastructure will be installed at a government-owned property at the Rye Patch State Recreation Area on 2505 Rye Patch Reservoir Road, Lovelock, Nevada 89419. Two two-port Direct Current Fast Chargers and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-16
Action Title: NEH – Wells Charging Station
Project ID: NVDEMF 20-17
Date Approved: April 5, 2021
NOx Mitigation: 0.10 tons
Project Summary: NDEP has awarded $310,610.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Wells, Nevada. Specifically, the charging infrastructure will be installed at a government-owned property near the intersection of Interstate-80 and US 93 at 1222 6th Street, Wells, NV 89835. One Direct Current Fast Charger and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-17
Download the Revised Eligible Mitigation Action submission for NVDEMF 20-17
Action Title: NEH – Baker Charging Station
Project ID: NVDEMF 20-18
Date Approved: April 5, 2021
NOx Mitigation: 0.105 tons
Project Summary: NDEP has awarded $363,180.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Baker, Nevada. Specifically, the charging infrastructure will be installed at the Border Inn Rest Stop at the Highway 50 Border between Nevada and Utah. Two Direct Current Fast Chargers will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-18
Download Revised Eligible Mitigation Action NVDEMF 20-18
Download Second Revised Eligible Mitigation Action NVDEMF 20-18
Action Title: NEH – Carlin Charging Station
Project ID: NVDEMF 20-19
Date Approved: April 5, 2021
NOx Mitigation: 0.10 tons
Project Summary: NDEP has awarded $240,000.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Carlin, Nevada. Specifically, the charging infrastructure will be installed at Khoury's Fresh Market at 730 10th Street, Carlin, Nevada 89822. One Direct Current Fast Charger and one two-port Level 2 Charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 20-19
Action Title: NEH – Eureka Charging Station
Project ID: NVDEMF 21-01
Date Approved: May 3, 2021
NOx Mitigation: 0.08 tons
Project Summary: NDEP has awarded $310,940.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Eureka, Nevada. Specifically, the charging infrastructure will be installed on Highway 50 at 110 South Main Street, Eureka, Nevada 89316. Two two-port Direct Current Fast Chargers will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 21-01
Download Revised Eligible Mitigation Action NVDEMF 21-01
Download Second Revised Eligible Mitigation Action NVDEMF 21-01
Action Title: NEH – Middlegate Charging Station
Project ID: NVDEMF 21-02
Date Approved: December 14, 2021
NOx Mitigation: 0.213 tons
Project Summary: NDEP has awarded $141,265.04 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in the unincorporated community of Middlegate, Nevada. Specifically, the charging infrastructure will be installed off of Highway 50 at 42500 Austin Highway, Fallon, Nevada 89406. One two-port Direct Current Fast Charger and one two-port Level 2 charger will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 21-02
Action Title: NEH – LV Speedway Charging Station
Project ID: NVDEMF 21-03
Date Approved: December 14, 2021
NOx Mitigation: 0.11 tons
Project Summary: NDEP has awarded $80,547.00 to the GOE to support the installation of publicly available light duty electric vehicle charging infrastructure in Las Vegas, Nevada. Specifically, the charging infrastructure will be installed along I-15 and US 93 at 6585 Speedway Boulevard, Las Vegas, Nevada 89115. Two two-port Direct Current Fast Chargers will be installed because of this project.
Download Eligible Mitigation Action NVDEMF 21-03
Category 10 – The Diesel Emission Reduction Act (DERA) Option
Completed Category 10 Projects
Action Title: DERA – City of Reno Flusher Truck Replacement
Project ID: NVDEMF 18-01
Date Approved: May 18, 2018
NOx Mitigation: 1.29 tons
Project Summary: This replacement project will permanently remove from service three-2005 engine model year diesel-powered Class 8 City of Reno owned flusher trucks for three-2018 diesel-powered Class 8 equivalents. The total cost of this project is $958,854.81 with $95,885.48 of that being requested from the Volkswagen Environmental Mitigation Trust Fund.
Download Eligible Mitigation Action NVDEMF 18-01
Action Title: DERA - Clark County School District School Bus Replacement
Project ID: NVDEMF 18-02
Date Approved: May 18, 2018
NOx Mitigation: 1.74 tons
Project Summary: This replacement project will permanently remove from service five-2005 engine model year diesel-powered Clark County School District owned school buses for five-2018 diesel-powered equivalents. The total cost of this project is $768,486.60 with $68,000 of that being requested from the Volkswagen Environmental Mitigation Trust Fund.
Download Eligible Mitigation Action NVDEMF 18-02
Action Title: DERA – City of Reno Paint Striper Truck Replacement
Project ID: NVDEMF 18-03
Date Approved: August 16, 2018
NOx Mitigation: 0.21 tons
Project Summary: This replacement project will permanently remove from service one-2004 engine model year diesel-powered Class 7 City of Reno owned paint striper truck for one-2018 diesel-powered Class 7 equivalent. The total cost of this project is $423,444 with $42,344.40 of that being requested from the Volkswagen Environmental Mitigation Trust Fund.
Download Eligible Mitigation Action NVDEMF 18-03
Action Title: DERA – City of Reno Combination Plow/Dump Truck Replacement
Project ID: NVDEMF 18-04
Date Approved: October 16, 2018
NOx Mitigation: 0.42 tons
Project Summary: This replacement project will permanently remove from service one-2002 engine model year diesel-powered Class 8 City of Reno owned combination plow/dump truck for one-2019 diesel-powered Class 8 equivalent. The total cost of this project is $228,102.20 with $25,771.12 of that being requested from the Volkswagen Environmental Mitigation Trust Fund.
Download Eligible Mitigation Action NVDEMF 18-04
Action Title: DERA – Clark County School District School Bus Replacement
Project ID: NVDEMF 19-10
Date Approved: May 17, 2019
NOx Mitigation: 8.21 tons
Project Summary: This replacement project will permanently remove from service 18-2006 diesel-powered Clark County School District owned school buses for 18-2019 diesel-powered equivalents. The total cost of this project is $2,079,857.60 with $274,971.00 of that being requested from the Volkswagen Environmental Mitigation Trust Fund.
Download Eligible Mitigation Action NVDEMF 19-10
Action Title: DERA – Clark County School District School Bus Replacement
Project ID: NVDEMF 20-01
Date Approved: April 20, 2020
NOx Mitigation: 2.16 tons
Project Summary: NDEP has awarded the Clark County School District $425,000.00 to support the replacement of eleven-2007 diesel-powered school buses for new diesel-powered replacements. Of NDEP’s $425,000 award, $182,628.16 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 20-01
Action Title: DERA – City of Reno Service Vehicle Replacement
Project ID: NVDEMF 20-12
Date Approved: July 14th, 2020
NOx Mitigation: 0.77 tons
Project Summary: NDEP has awarded the City of Reno $271,419.00 to replace four combination plow/dump trucks and one boom truck. Of NDEP’s $271,419.00 award, $108,567.60 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 20-12
Action Title: DERA - Clark County School District (CCSD) _ Churchill County School District (ChCSD) Electric School Bus Project
Project ID: NVDEMF 21-05
Date Approved: May 23, 2022
NOx Mitigation: 0.961 tons
Project Summary: NDEP has awarded $219,150.00 to the CCSD to support the replacement of one biodiesel-powered school bus, engine year 2011, with a new electric equivalent. This 2011 biodiesel school bus will then be donated to ChCSD to replace a 2001 diesel-powered school bus. Of NDEP's $219,150 award, $38,337.00 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 21-05
Action Title: DERA - Carson City School District (CaCSD) Electric School Bus Project
Project ID: NVDEMF 21-06
Date Approved: May 23, 2022
NOx Mitigation: 0.730 tons
Project Summary: NDEP has awarded $397,500.00 to the CaCSD to support the replacement of two diesel-powered school buses, engine years 2000 and 2002, with new electric equivalents. Of NDEP's $397,500 award, $55,344.00 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 21-06
Download Revised Eligible Mitigation Action NVDEMF 21-06
Action Title: DERA - City of Reno Diesel Snowplow Replacement
Project ID: NVDEMF 22-04
Date Approved: September 14, 2022
NOx Mitigation: 0.031 tons
Project Summary: NDEP has awarded $44,831.00 to the City of Reno to support the early reitrement and replacement of one-2004 diesel-powered snowplow with one-2023 diesel-powered snowplow. Of NDEP's $44,831.00 award, $27,329.24 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 22-04
Action Title: DERA - Carson City School District (CaCSD) Second Electric School Bus Project
Project ID: NVDEMF 22-05
Date Approved: December 12, 2022
NOx Mitigation: 0.642 tons
Project Summary: NDEP has awarded $417,967.20 to CaCSD to support the early reitrement and replacement of two-2004 diesel-powered school buses with new electric versions. Of NDEP's $397,679.00 award, $307,100.20 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 22-05
Download Revised Eligible Mitigation Action NVDEMF 22-05
Action Title: DERA - Washoe County School District (WCSD) Electric School Bus Project
Project ID: NVDEMF 22-06
Date Approved: December 12, 2022
NOx Mitigation: 0.584 tons
Project Summary: NDEP has awarded $311,626.00 to WCSD to support the early reitrement and replacement of two-2004 diesel-powered school buses with new electric versions. Of NDEP's $311,626.00 award, $133,747.60 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 22-06
Action Title: DERA - Washoe County School District (WCSD) Diesel School Bus Project
Project ID: NVDEMF 22-07
Date Approved: February 21, 2023
NOx Mitigation: 11.251 tons
Project Summary: NDEP has awarded $572,113.89 to WCSD to support the early retirement and replacement of one-2000, one-2005, and ten-2004 diesel-powered school buses with new, cleaner diesel versions. Of NDEP's $572,113.89 award, $218,476.89 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 22-07
Action Title: DERA - Clark County School District (CCSD)_Esmeralda County School District (EsCSD) Second Electric School Bus Project
Project ID: NVDEMF 22-08
Date Approved: June 13, 2023
NOx Mitigation: 1.122 tons
Project Summary: NDEP has awarded $311,626 to CCSD to support the early reitrement and replacement of two-2011 biodiesel-powered school buses with new, battery electric versions. Of NDEP's $311,626 award, $200,621.40 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 22-08
Ongoing Category 10 Projects
Action Title: DERA - Washoe County School District (WCSD) Second Diesel School Bus Project
Project ID: NVDEMF 24-01
Date Approved: November 18, 2024
NOx Mitigation: 2.371 tons
Project Summary: NDEP has awarded $575,867 to WCSD to support the early reitrement and replacement of nine-2005 and two-2008 diesel-powered school buses with new, cleaner diesel versions. Of NDEP's $575,867 award, $468,460 is being requested from the Volkswagen Environmental Mitigation Trust Fund and the rest is being awarded through the Nevada Clean Diesel Program.
Download Eligible Mitigation Action NVDEMF 24-01