1942-03-31 Aerial view of several buildings under construction at the BMI plant. The image shows a portion of the chlorine plant including brine preparation tanks and footings (upper left) steel framing of the cell renewal building (center) chlorine cell buildings (center right and left) and drying, cooling, and liquefaction units between the cell buildings. The temporary brick grinding building is in the lower right.
1943-02-15 Aerial view of the chlorine plant buildings at BMI.
2005-06-07 Soil Vapor Extraction System. Operated on the site of the former Montrose Plant from 2005 until 2010.
2006-08-23 Groundwater Treatment System. Monitoring well in foreground, treatment system in background.
In recognition of National Lead Poisoning Prevention Week, Nevada is celebrating the successful effort to conduct lead testing programs in public schools, public charter schools, and licensed child care facilities across the state.