|
HWAAP-B33 102 PRODUCTION AREA (BUILDING 102-51 CATCHMENT PIT)
SITE DESCRIPTION
HWAAP-B33 is an inactive unlined surface impoundment located south of Building 102-51 measuring 25 by 25 by 12 feet. The pit shows no signs of use or erosion. The use and operating practices for the pit are unknown. Remedial Investigation work in 1994 consisted of collecting one surface soil sample, one hand auger sample and one cone penetrometer soundings. Five metals were detected in the soil samples but at a low concentration. No explosives were detected in the soil.
PROPOSED PLAN
A Closure Decision Document was approved by the NDEP in March 2000.
Decision Document
Previous Site Summary Next Site Summary
IRP Home Page
Table of Contents -- IRP Site Summaries  
NDEP - Site Map
|