NDEP Programs & Services
Public Information
& More
NDEP Unique
Websites
Financial
Assistance
NDEP
Online Sevices
Agency Contact
Info.
More About
NDEP

Loading
  Construction Stormwater Permit Back BWPC Home Page   

User Instructions: NDEP requires owner/operators to obtain a Construction Stormwater Permit if the project will disturb more than one (1) acres, or will disturb less than one (1) acre but is part of a larger common plan for development or sale that will ultimately disturb one (1) or more acres.

If NDEP determines that a project less than one (1) acre in size will impact receiving waters or its tributaries within a 1/4-mile radius of the project, the owner/operator of the project will also be required to obtain a construction stormwater permit.

If the construction site requires a construction stormwater permit, the owner/operator must complete a Notice of Intent (NOI) for coverage under the Construction Stormwater General Permit NVR100000. After filling in the required information, you will need to print out the confirmation page, have an authorized person sign it, then send the confirmation page and a $200 filing fee to NDEP at the address listed below.

NDEP recommends that you read the 2015 Construction Stormwater General Permit and Fact Sheet for more detailed information about the requirements of the permit.

Applies to:

Construction activity defined under Category X of 40 CFR 122.26(b)(14). Stormwater Discharge Associated with Construction Activity, applying to projects disturbing at least one acre, or will disturb less than one (1) acre but are part of a larger common plan for development or sale that will ultimately disturb one (1) or more acres.

Filing Fee:

$200.00

Annual Fee

$200.00 / Fiscal Year (July 1, XXXX through June 30, XXXX)

Payable to:

Nevada Division of Environmental Protection

Submit to

Bureau of Water Pollution Control
Nevada Division of Environmental Protection
901 South Stewart Street, Suite 4001
Carson City NV 89701-5249

Contacts

Bureau of Water Pollution Control
Nevada Division of Environmental Protection
901 S. Stewart St., Ste 4001
Carson City NV 89701
Phone: 775.687.9418 - Fax: 775.687.4684
Website

Online Permit:

Notice of Intent (NOI) — Online Application Form

2015 Construction Stormwater General Permit NVR100000 -- 640 KB
2015 Construction Stormwater Fact Sheet -- 200 KB

Forms and Documents:

Notice of Termination (NOT)- Form

NDEP Best Management Practices (BMP) Manual - Online
BMP Fact Sheets -- 26 pages -- 800KB
Construction Site Map Examples - Draft

External Links

EPA's Stormwater Program Website
Clark County / Las Vegas and Associated Information
Washoe County and Associated Information
Truckee Meadows BMP Manual -- External Link

Nevada Privacy Policy