Process Flow Diagram and Dictionary
for the
Underground Test Area Corrective Action Units


Process Section -- CR
Block Descriptor -- Develop Closure Report


If the results of the pre-closure monitoring fall within limits previously defined in the Monitoring CAP, a Closure Report will be prepared to propose that the CAU be designated a closed site. The closure report will describe the results of closure, establish long-term monitoring requirements for the CAU, develop technical and administrative contingency plans for actions to be taken if long-term monitoring results are not acceptable, and define future land-use restrictions. The structure of the report is based on requirements specified in the most recent document outline agreed to by DOE and NDEP prior to document preparation.