|
TIMET — Photos
In late 2004 TIMET cleaned out existing ponds HP-1 and HP-6 which are located on-site. Following clean up, new pond liners and leak detection system were installed over the historic liners and leak detection systems. Pictures of the clean up process are provided below.
|
|
|
|
|