TIMET — Photos

TIMET has excavated a majority of historic CSD Ponds North and South. This resulted in the removal of approximately 20,000 cubic yards of historic waste materials. Before and after pictures are presented below.

CSD Ponds North and South during removal (two pictures)


Waste material loading process



Information Contact: — NDEP Public Information Officer: (775) 687 - 9395


BMI Remediation Home Page
Home — Bureau of Corrective Actions
Site Index  —  Topic Index
NDEP Home Page