Lyon County Utilities - Crystal Clear Water System Arsenic Mitigation Project

Vicinity Map
Vicinity Map - Click thumbnail above to open a larger view of the map.

PHOTOS

Readers Note: Click images to expand view - images will open in a new browser window. Place your cursor over the thumbnail photo for a description.

Transmission Line from the City of Yerington - water line followed highway 95A to Fox Lane - down Fox Lane to the booster pump station at Fox Lane & Thurston Way, and down a dirt road to the new storage tank site
Installation of a section of 12-inch PVC transmission line along highway 95A (photo courtesy of Farr West Engineering) Ditch crossing on the Santos Property along highway 95A (photo courtesy of Farr West Engineering One of several pipe installations under existing irrigation culverts (photo courtesy of Farr West Engineering)
Jack and bore by Silver State Boring under highway 95A at Hendrichs Road (photo courtesy of Farr West Engineering) Jack and bore by Silver State Boring under highway 95A at Hendrichs Road (photo courtesy of Farr West Engineering) Jack and bore by Silver State Boring under highway 95A at Hendrichs Road (photo courtesy of Farr West Engineering)
Installation of the 10-inch transmission line from the booster pumps to the new storage tank (photo courtesy of Farr West Engineering) Installation of the 10-inch transmission line from the booster pumps to the new storage tank - a little rock encountered as Campbell approached the tank site (photo courtesy of Farr West Engineering) Installation of the 10-inch transmission line from the booster pumps to the new storage tank - a little rock encountered as Campbell approached the tank site (photo courtesy of Farr West Engineering)
Booster Station
Installation of the two in-line pitless booster pumps (photo courtesy of Farr West Engineering) Compacting bedding material around the new booster pumps (photo courtesy of Farr West Engineering) New booster pumps with valve vault being installed (photo courtesy of Farr West Engineering)
New booster pumps with valve vault installed (photo courtesy of Farr West Engineering) Pouring concrete at booster pump station (photo courtesy of Farr West Engineering) Completed booster pump station with primary and backup pump and backup generator located at the corner of Fox Lane & Thurston Way
New Storage Tank
Site excavation for new storage tank (photo courtesy of Farr West Engineering) Constructing the roof braces on the new welded steel storage tank (photo courtesy of Farr West Engineering) Painting the inside of the new storage tank (photo courtesy of Farr West Engineering)
Storage tank complete & awaiting connection to transmission line and outlet pipeline Tank inlet & outlet pipeline and appurtenances (photo courtesy of Farr West Engineering Completed storage tank