Construction Stormwater Permit and Associated Information

User Instructions: We suggest users read the fact sheet and the general permit listed below and related information to determine if your activity requires a construction stormwater permit.

If you are subject to the permitting requirements, please complete a Notice of Intent (NOI) for coverage under the General Permit by completing the Online form (see link below.) After completing the online form you will need to print the document and mail it to NDEP at the address indicated.


Applies to:

Construction activity defined under Category X of 40 CFR §122.26(b)(14). Stormwater Discharge Associated with Construction Activity, applying to projects disturbing at least one acre.

Filing Fee:

$200.00

Annual Fee

$200.00 / Fiscal Year (July 1, XXXX through June 30, XXXX)

Payable to:

Nevada Division of Environmental Protection

Submit to

Bureau of Water Pollution Control
Nevada Division of Environmental Protection
901 South Stewart Street, Suite 4001
Carson City NV 89701-5249



Note — Most documents are in Adobe PDF File Format

Notice of Intent (NOI) — Online Form
Notice of Termination (NOT)

Stormwater General Permit NVR100000
Construction Fact Sheet
Construction Rainfall Erosivity Waiver Fact Sheet

Small Construction Activity Waiver (This process is accomplished through the Notice of Intent)
BMP Manuals -- Prepared by Associated General Contractors of America
BMP Fact Sheets -- 26 pages Adobe PDF file -- 800KB

NDEP Best Management Practices (BMP) Manual
The Federal Stormwater Program Frequently Asked Questions -- 7 pages Adobe PDF file format
Example Site Map - Draft
Model Storm Water Pollution Prevention Plan (SWPPP) Template
   External Links
EPA's Stormwater Program Website
Clark County / Las Vegas and Associated Information
Washoe County and Associated Information
Washoe County BMP Manua -- External Link

Home
Bureau of Water Pollution Control

Site Index — Topic Index
NDEP Home Page